October 2023

Eastvale Community Center Pinnacle Room Flooring Project

Scope of Work Each Bidder is to evaluate the area to determine the required square footage amount of flooring material needed. Contractor shall provide all the necessary personnel, materials, equipment, transportation, safety apparatus, etc. required to remove and dispose existing flooring, prep floor, moisture test, install LVT, install base, install equal or above quality product as outlined in Section VII – Exhibit “A” and install thermoplastic Rubber Cove Roll Base of 4” (colored to be selected) per attached Exhibit A, attached hereto and made a part thereof.

Eastvale Community Center Pinnacle Room Flooring Project Read More »

23-008 Michigan Park Improvements

SCOPE OF WORK: 1.PORCHES, STEPS, AND RAMPS TO BE SUPPLIED AND INSTALLED BY OTHERS IN ACCORDANCE WITH THE LOCAL BUILDING DEPARTMENT 2. PORTABLE FIRE EXTINGUISHERS TO BE SUPPLIED AND INSTALLED ON SITE BY OWNER IN ACCORDANCE WITH LOCAL BUILDING DEPARTMENT 3. THE BUILDING OWNER IS RESPONSIBLE FOR THE DEVELOPMENT & DESIGN OF ALL SITE REQUIRED ACCESSIBILITY ELEMENTS. THESE ELEMENTS ARE NOT INCLUDED IN THE SCOPE OF THIS DESIGN. SUBMITTALS ARE REQUIRED BY OWNER THROUGH THEIR DESIGN PROFESSIONAL

23-008 Michigan Park Improvements Read More »

Street Improvements for Edwards Street From Westminster Boulevard to Trask Avenue

SCOPE OF WORK A. General and Specifications. The work consists of the removal and the replacement of damaged PCC curb, gutter, sidewalk, and deteriorated pavement areas; installation of detectable warning surface (truncated dome); cold plan existing pavement & crack fill entire street width, placing asphalt rubberized hot mix (ARHM) surface course; adjusting storm drain manholes, sewer manholes, and water/hydrant valve covers to finished grade; installing traffic signal loops, traffic control, signs, posts, striping, pavement marking, curb marking and all appurtenant work in connection therewith as shown on the plans and described in the specifications.

Street Improvements for Edwards Street From Westminster Boulevard to Trask Avenue Read More »

Streetlight Installation at Industry Business Center

Scope of ServicesInstallation of Streetlight poles with mast arms, luminaries, metering pedestals, 600-Volt cables, numbering of poles and handholes, Ubicquia Wireless Controller (nodes) for remote monitoring of streetlights, fuses, connectors, and connection of wires in existing conduit to make complete streetlight functional at Industry Business Center West-all materials are provided by the City of Industry

Streetlight Installation at Industry Business Center Read More »

Well Inspection and Rehabilitation of Orange Grove Well 2A Project Project No. 72863624

SCOPE OF WORK : specified in the bid proposal and these technical provisions shall be done in accordance with the provisions of the latest edition of the California Well Standards and the Standard Specifications for Public Works Construction (“Green Book”), and all amendments thereto, adopted by the Joint Cooperative Committee of Southern California Chapter, American Public Works Association and Southern California District, Associated General Contractors of California; hereinafter referred to as the “Standard Specifications”.

Well Inspection and Rehabilitation of Orange Grove Well 2A Project Project No. 72863624 Read More »

Well Inspection and Rehabilitation of Orange Grove Well 2a Project

SCOPE OF WORK :Work specified in the bid proposal and these technical provisions shall be done in accordance with the provisions of the latest edition of the California Well Standards and the Standard Specifications for Public Works Construction (“Green Book”), and all amendments thereto, adopted by the Joint Cooperative Committee of Southern California Chapter, American Public Works Association and Southern California District, Associated General Contractors of California; hereinafter referred to as the “Standard Specifications

Well Inspection and Rehabilitation of Orange Grove Well 2a Project Read More »