*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Street Improvements for Edwards Street From Westminster Boulevard to Trask Avenue

SCOPE OF WORK A. General and Specifications. The work consists of the removal and the replacement of damaged PCC curb, gutter, sidewalk, and deteriorated pavement areas; installation of detectable warning surface (truncated dome); cold plan existing pavement & crack fill entire street width, placing asphalt rubberized hot mix (ARHM) surface course; adjusting storm drain manholes, sewer manholes, and water/hydrant valve covers to finished grade; installing traffic signal loops, traffic control, signs, posts, striping, pavement marking, curb marking and all appurtenant work in connection therewith as shown on the plans and described in the specifications.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 10/23/2023 – 10:00 AM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:P- 2583

Veronica Johnson (714) 548-3463
Vejohnson@westminster-ca.gov

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 10/23/2023 – 10:00 AM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.