Districtwide Solid Waste and Recycling Services
SCOPE OF WORK Huntington Beach Union High School District (District) desires to contract with one highly qualified Bidder to pick
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Tiffany Lee (626) 254-2721
tlee@ArcadiaCA.gov
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
SCOPE OF WORK Huntington Beach Union High School District (District) desires to contract with one highly qualified Bidder to pick
THIS PROJECT INCLUDES Piedmont Park Pedestrian Bridge Replacement Project
SCOPE OF SERVICES The scope of work required under the terms of this Request for Proposals (RFP), will include providing
SCOPE OF WORK The District intends to retain a qualified and committed professional engineering consultant to review the recommendations from
PROJECT DESCRIPTION The existing Tanner Water Treatment Plant (WTP) does not have sufficient reliable storage capacity to meet the needs
Description of Work: Furnish all labor, materials, and supervision for blown in installation of Gorilla Mulch at four high school
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.