February 2024

Willow Avenue Street Improvements

Scope of Services This project involves ±0.5 miles of street improvements on Willow Avenue from Shaw Avenue to Barstow Avenue. Project improvements include removing and replacing existing AC pavement, replacement of curb returns, adjustments of utility boxes, manholes, and utility valve boxes to finished grade, replacements of traffic striping, markings and signage, traffic signal modification, and reinstallation of traffic loop detectors.

Willow Avenue Street Improvements Read More »

Bullard Avenue Street Improvements

Scope of Services This project involves ±0.25 miles of street rehabilitation on Bullard Avenue from Villa Avenue to Minnewawa Avenue. Project improvements include removing and replacing existing AC pavement, replacement of curb returns, drive approaches, median island cap, adjustments of utility boxes, manholes, and utility valve boxes to finished grade, replacements of traffic striping, markings and signage, traffic signal modification, and reinstallation of traffic loop detectors.

Bullard Avenue Street Improvements Read More »

CHP Oakhurst Area Office– Roof Replacement Services

SCOPE OF WORK Contractor agrees to provide to the Department of California Highway Patrol (CHP) with all labor, materials, tools, equipment, activation fees, including travel, and every other item of expense necessary to perform Fire Alarm System Replacement at its Oakhurst Area office. Contractor agrees to provide the California Highway Patrol (CHP) Licenses: California Contractors State License Board (CSLB) C-16 Fire Protection Contractor Valid local City or County Business license Contractor shall provide a Payment Bond equal to 100 percent of the value of the Agreement. Contractor shall complete State of California Standard 807, in duplicate, and submit prior to the commencement of work.

CHP Oakhurst Area Office– Roof Replacement Services Read More »

CHP Fort Bragg Resident Post – Roof Replacement Services

SCOPE OF WORK Contractor agrees to provide to the Department of California Highway Patrol (CHP) Fort Bragg Resident Post, the services described herein: furnish all supplies, materials, tools, equipment, labor, personnel, and supervision; pay all taxes, insurance, bonds, license and permit fees, and all other direct and indirect costs necessary to provide Roof Replacement Services as set forth in this Agreement. License Requirement/Certification: The contractor must possess a valid C-39 California Contractor’s State License Board Specialty License. Thermoplastic Polyolefin (TPO) factory certification issued by the manufacturer. The contractor shall provide a Payment Bond equal to 100 percent of the value of the Agreement. The contractor shall complete State of California Standard 807, in duplicate, and submit prior to execution of the Agreement.

CHP Fort Bragg Resident Post – Roof Replacement Services Read More »

California State Prison, Solano Sol Roof Replacement Phases I, (Roof BCP) FOB Destination

SCOPE OF WORK The project(s) described in this solicitation are critical to Facility Planning Construction and Management (FPCM) and must be completed on-time. This description establishes the minimum requirements for a complete roofing system to be delivered to California State Prison, Solano located at 2100 Peabody Road, Vacaville CA 95696. THIS IS A MATERIAL AND FABRICATION PURCHASE ONLY; THE STATE WILL INSTALL.

California State Prison, Solano Sol Roof Replacement Phases I, (Roof BCP) FOB Destination Read More »

Water Tank Exchange System Maintenance and Repair Services

Scope of Work: Report shall include but not be limited to the following: date/time of service description of service provided, including size/type of replaced or repaired parts/valves and/or pipe name and signature of Contractor and/or service technician providing service Location of work Description/dimension of area work surface and any noted deficiencies and suggested corrective action Signature of Institution Contract Liaison/designee certifying indicated services were performed

Water Tank Exchange System Maintenance and Repair Services Read More »

Gas Turbine Generator Maintenance, Inspection, and Repair Service

Scope of Work: The Contractor shall maintain a minimum of four (4) change-out sets of air filters on site.Semi-annual and annual maintenance shall be performed during non-peak electrical months, November 1st through April 30th. With the semi-annual maintenance tasks performed during the month of November and the annual maintenance tasks being performed during the month of April.

Gas Turbine Generator Maintenance, Inspection, and Repair Service Read More »