Lower San Pablo Phase-01 Sewer Replacement Project
SCOPE of WORK Obtaining all permits and providing all necessary materials, supplies, equipment, services and personnel, to adequately carry out or complete the Project. Remove and replace 163 LF of existing 6” sewers with 8” PVC C-900 if by open trench or HDPE SDR-17 if by a pipe bursting. Remove and replace 10 LF of existing 10” gravity sewer main with 10” PVC C900 pipe by open trench in the public right of way. Remove and replace 373 LF of existing 15” gravity sewer main with 18” HDPE SDR17 by pipe bursting. Remove and replace 507 LF of existing 10” gravity sewer main with 18” C900 by open trench within easements on private properties.