*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Lower San Pablo Phase-01 Sewer Replacement Project

SCOPE of WORK Obtaining all permits and providing all necessary materials, supplies, equipment, services and personnel, to adequately carry out or complete the Project. Remove and replace 163 LF of existing 6” sewers with 8” PVC C-900 if by open trench or HDPE SDR-17 if by a pipe bursting. Remove and replace 10 LF of existing 10” gravity sewer main with 10” PVC C900 pipe by open trench in the public right of way. Remove and replace 373 LF of existing 15” gravity sewer main with 18” HDPE SDR17 by pipe bursting. Remove and replace 507 LF of existing 10” gravity sewer main with 18” C900 by open trench within easements on private properties.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 03/01/2024 – 2:00 PM
Pre-Bid Mtg: Yes – Mandatory
Pre-Bid Mtg Date: 01/09/2024 – 10:00 AM
Engineer’s Est. Min: $1137802
Engineer’s Est. Max: $1137802

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:18CS204

Mohammed Masoud (510) 407-9563
mmasoud@wcwd.org

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 03/01/2024 – 2:00 PM

Other Projects

Jail Roofing Project

PROJECT DESCRIPTION: The Madera County Jail Roofing Project consists of a restoration of the existing base flashings with Silicone and

Read More »

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.