GROSSMONT COLLEGE PERIMETER ROAD PHASE II
Scope of Work – The scope of the Grossmont College Perimeter Road Repair Phase II will include a pavement condition assessment of the condition of Grossmont College Drive that was prepared in 2020 and determined that a large portion of the road was in poor condition. These remaining areas will require removal and replacement of the asphalt paving along with added speed bumps, signage, and road gate repairs.
GROSSMONT COLLEGE PERIMETER ROAD PHASE II Read More »