Grossmont College Perimeter Road Phase II

Scope of Work – The scope of the Grossmont College Perimeter Road Repair Phase II will include a pavement condition assessment of the condition of Grossmont College Drive that was prepared in 2020 and determined that a large portion of the road was in poor condition. These remaining areas will require removal and replacement of the asphalt paving along with added speed bumps, signage, and road gate repairs.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 06/04/2024 – 2:00 PM
Pre-Bid Mtg: Yes – Non-Mandatory
Pre-Bid Mtg Date: 05/14/2024 – 2:00 PM
Engineer’s Est. Min: $677340
Engineer’s Est. Max: $677340

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:B24.015

Jami Johnson (619) 644-7633
jjohnson@gafcon.com

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 06/04/2024 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.