February 2024

Water Treatment Services

Scope of Work: WATER TREATMENT SERVICES INMATE/WARD LABOR PROGRAM CALIFORNIA STATE PRISON, SOLANO Providing and adding cleaner chemicals to clean newly installed pipe system Providing and adding inhibitor chemicals to maintain newly installed pipe conditions Knowledge of Closed-Loop Hydronic System water treatment Providing written documentation describing the process(es) and chemical(s) added to the system at the completion of treatment at each location. Providing a report explaining the process taken to clean/treat the system, including chemical quantities and types used, as well as water parts per million (PPM) levels at the completion of housing unit treatment. Up to eight (8) hours of institutional training to demonstrate proper pre-treat testing, adding of chemicals and post-treatment testing. Providing fifty (50) additional gallons each of cleaner and inhibitor solutions and water test kit to be left on site for institution to use on an as needed basis.

Water Treatment Services Read More »

Underground Utility Locating Services Inmate/ward Labor Program

Scope of Work: A narrative description of the services performed. Formal notes and reports of all services and a Site Plan marked with general locations of underground utilities found shall be submitted within five (5) business days following actual performance of services. All such information will include the name of the responsible person that performed services on-site.

Underground Utility Locating Services Inmate/ward Labor Program Read More »

Impedance Bond

SCOPE OF WORK :The San Diego Metropolitan Transit System (MTS) is looking for a capable contracted supplier (CS) that can provide impedance bonds. The manufacturer is Twinco Mfg. Co., Inc. and the part number is 000-1667-1-0. The MTS Material number is 70202692. ATT 2 is the manufacturer’s specification for reference. Therefore, for this solicitation, whenever a specific “Brand Name” is mentioned in the minimum technical specifications, it is to be considered solely illustrative and used merely to describe a unit that has been selected by MTS as best meeting the specific minimal operational, design, performance, capacity, maintenance, quality, and reliability criteria of the desired end product. Wherever a “Brand Name” appears, the term “or approved equal” shall be automatically inferred.

Impedance Bond Read More »

Safe Routes to School: Pedestrian Improvements at Six Schools

Scope of Work The Contractor shall furnish all labor, supervision, equipment, material, facilities, transportation and services required to perform fusion splicing of fiber optic cable. Transporting splice closures from a City Engineer designated storage facility to job site Underground splice closure installation Fusion Splice and terminate cables Cable racking at pull boxes OTDR cable testing after cable installation and splicing Insertion Loss Power acceptance testing Traffic and safety control at job site Cleanup

Safe Routes to School: Pedestrian Improvements at Six Schools Read More »

Edge Line Striping

THIS PROJECT INCLUDES:The work to be done consists, in general, of installing approximately 84 miles (42 road miles) of thermoplastic edge line striping in several locations within Fresno County. The County of Fresno affirms that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation. Bidders are advised that, as required by federal law, Disadvantaged Business Enterprise (DBE) requirements are included in Section 2, “Bidding,” under subsection 2-1.12 “Disadvantaged Business Enterprises”.

Edge Line Striping Read More »

Jensen Avenue Overlay and Shoulder Improvements

THIS PROJECT INCLUDES:The work to be done consists of, in general, constructing a 4-foot-wide paved shoulder with shoulder backing, and asphalt concrete overlay on West Jensen Avenue from South Madera Avenue to South Dickenson Avenue (approximately 5.01 miles) in the County of Fresno, California. It also includes the realignment of the road’s crown line from approximately road stations 180+50 to 274+75, grind and overlay road pavement at Jensen and Dickenson intersection, reconstruction of the concrete curb islands at Jensen and Dickenson intersection for the existing traffic light poles, removal of abandoned culvert headwalls, and installation of road pavement striping, signs and other miscellaneous items as specified in the plans and specifications. The project may require a certain work sequencing. Attention is directed to Section 10-1.02A of the Special Provisions.

Jensen Avenue Overlay and Shoulder Improvements Read More »