June 2023

Pacific Station North METRO Interim Operations Plan Design Services

Consultant shall review the initial METRO Interim Operations Plan dated November 7, 2021, developed by City and METRO attached as Exhibit A. A full-size .pdf file can be requested via email to ndaly@santacruzca.gov. Consultant shall attend a kick-off/design meeting with City and METRO. Consultant shall meet with METRO to identify, refine, and finalize METRO’s interim operational requirements. The city shall provide Consultant with available aerial photography and standard specifications and construction details for Consultant’s use in developing the METRO Interim Operations Plan.

Pacific Station North METRO Interim Operations Plan Design Services Read More »

Neary Lagoon Tule and Sediment Removal Project

The Project to be performed consists of furnishing all labor, materials, tools, equipment, and transportation required to complete the Project, with a scope of work to generally include, but is not limited to, the following: Vegetation removal, sediment management/dredging, trucking activities within Neary Lagoon including but not limited to mowing, grubbing, trimming, and liming (the “Work”) and trucking both to the off-site final disposal site.

Neary Lagoon Tule and Sediment Removal Project Read More »

West Cliff Drive Stabilization (C401501)

The Project to be performed consists of furnishing all labor, materials, tools, equipment, and transportation required to complete the Project, with a scope of work to generally include, but is not limited to, the following: drilling several concrete piers into competent material, placement of concrete and other structural fill, anchored in place by new piers, restoration of the path and roadway, and relocation of existing riprap at the toe of slope of the new infill wall (the “Work”).

West Cliff Drive Stabilization (C401501) Read More »

Consultant Services to Update the Groundwater Sustainability Plan and Develop the Annual Reports

This work will include the updates and refinement of the C2VSimTM model, as well as analysis updates of DWR’s geophysical data to improve the hydrogeologic conceptual model. Additionally it may include incorporation of existing wells, and construction of new wells where deemed appropriate for data reliability and modeling purposes.

Consultant Services to Update the Groundwater Sustainability Plan and Develop the Annual Reports Read More »

FY 2023-2024 Fence and Gate Repair & Maintenance Services

The scope of work to be performed under this contract is generally described as provision of labor, tools
and materials to provide 2 types of service: 1. scheduled biannual (twice a year at approximately 6 month
intervals) maintenance of (9) City-owned automated horizontal sliding steel fence gates and 2. Emergency
/ on-call or planned repair of any City-owned automated or manual gates or fences within the City of
Lathrop. Note that the on-call services contemplated by this contract must be provided as requested by the
City of Lathrop on a (24/7) basis, with a maximum contractor response time of two hours and completion
of requested services as soon as practicable

FY 2023-2024 Fence and Gate Repair & Maintenance Services Read More »

HSIPL 5945(122) HSIP Cycle 11 Safety Improvements

the County of Kings is seeking qualified Civil Engineering
consultants to complete the Preliminary Engineering (PE), Environmental, and Right of Way
(RW) phases for a Highway Safety Improvement Program (HSIP) project at various locations in
Kings County California. The work expected to be performed by the consultant is the preparation
of final plans, specifications, engineer’s estimate, environmental clearance, and right of way
acquisition for the addition of left turn lanes, installation of flashing beacons, and utility
relocation as it pertains to the intersection geometrics.

HSIPL 5945(122) HSIP Cycle 11 Safety Improvements Read More »