June 2023

Groundwater Drainage Improvements Phase 4 and 5 Fy 2022-23 Program

The work to be performed or executed under these plans and specifications consists of and includes utility trenching and restoration, installing a 4’ and 6” storm drain lines to convey localized groundwater to a nearby LACFCD storm drain, installation of a specific BMP treatment structure, and other incidental and appurtenant work necessary for the proper construction of the contemplated improvements, as indicated on the attached project plans. The project has obtained an LA County permit and the contractor will apply for a rider to complete the project.

Groundwater Drainage Improvements Phase 4 and 5 Fy 2022-23 Program Read More »

Area 3 Residential Neighborhood Ada Curb Ramp Improvement Project

The work to be performed or executed under these plans and specifications consists of and includes removal of existing sidewalk and curb & gutter and the construction of new PCC curb ramps with curb & gutter and a minimum 2’ HMA plug; and other incidental and appurtenant work necessary for the proper construction of the contemplated improvements, as indicated on the project plans for Area 3 Residential Neighborhood ADA Curb Ramp Project.

Area 3 Residential Neighborhood Ada Curb Ramp Improvement Project Read More »

Diamond Bar Center Security Camera System Replacement Project

Services will be provided for and administered through the Information Systems Department. Diamond Bar Center Camera Physical Installation (Please Review Appendix A and Appendix B) Remove 42 existing end-of-life Cisco Cameras and replace them with new Verkada Cameras Install and mount 42 new Verkada security cameras and associated domes and assemblies. (Please see the parts list itemized on the PlanetBids posting under the Line Items Tab) For internal cameras installed on the hard lid, it is requested that the vendor provide “Beauty Rings” or “Trim rings” to cover the difference in size between the existing cameras and the replacement cameras if the replacement cameras are smaller.

Diamond Bar Center Security Camera System Replacement Project Read More »

Bid #22-23-123 – HVAC Repair Districtwide

SCOPE OF WORK: The Contractor shall furnish all labor, materials, equipment, tools, and utility and transportation services, and perform and complete all work required in connection with HVAC Repair Districtwide Bid 22-23-123 (“Project”) in strict accordance with the Contract Documents enumerated in Article 7 below. The Contractor shall be liable to the District for any damages arising as a result of a failure to comply with that obligation, and the Contractor shall not be excused with respect to any failure to so comply by an act or omission of the Architect, Engineer, Inspector, Division of the State Architect (DSA),

Bid #22-23-123 – HVAC Repair Districtwide Read More »