CA

Irrigation Replacement and Landscape Refresh Project

Scope of Services The Work includes the grubbing and clearing of certain plantings and renovating the SAWPA grounds with new landscape and irrigation system upgrades. The project consists of providing all labor, materials, and equipment required to construct the landscape and irrigation renovations depicted in the Approved Plans entitled, “Irrigation Replacement and Landscape Refresh” The project includes but is not limited to furnishing and installing all materials and appurtenances, and all equipment and labor required to construct the work depicted on the Approved Plans and described herein.

Irrigation Replacement and Landscape Refresh Project Read More »

Planning Services – 2024 SCADA, Instrumentation, and Control System Master Plan

Scope of Work: Review of the existing reference information and site visits Meetings and workshops with representatives from the Department Engineering evaluations as outlined in the Scope of Work Creation of standards for various SCADA, I&C and security elements. Evaluations and findings and recommendations are summarized in several technical memoranda. Develop an Employee Summary Report Delivery of a Capital Improvement Plan report for all resultant projects with project information sheets and detailed scopes of work

Planning Services – 2024 SCADA, Instrumentation, and Control System Master Plan Read More »

Fire Alarm/Sprinkler Inspection and Testing Services

Scope of Services INTRODUCTION Riverside Transit Agency (RTA) invites bids from qualified contractors to perform quarterly visual inspections and annual fire alarm inspections and testing at its Riverside, CA and Hemet, CA facilities. Prospective bidders shall possess a state of California C-16 contractor’s license to meet the requirements of the project. This is a prevailing wage project; therefore, the contractor and any subcontractors must be registered with the State of California Department of Industrial Relations at the time of bid submittal. The contract term shall be for a one-year base term, effective from March 1, 2024 through February 28, 2025 with two subsequent one-year option terms that can be exercised by the RTA. RTA anticipates award of a firm-fixed priced contract for this project.

Fire Alarm/Sprinkler Inspection and Testing Services Read More »

Prop a Concrete Bus Pad Installation Project

SCOPE OF SERVICES North side Redondo Beach Blvd. west of Prairie Ave. North side Redondo Beach Blvd. east of Freeman Ave. North side Artesia Blvd. east of Inglewood Ave. South side Rosecrans Ave. west of Firmona Ave. West side Prairie Ave. north of 147th St. West side Prairie Ave. north of 154th St. South side Marine Ave. west of Firmona Ave. South side Marine Ave. east of Freeman Ave. North side Marine Ave. east of Freeman Ave. North side Marine Ave. west of Firmona Ave. West side Hawthorne Blvd. north of Manhattan Beach Blvd.

Prop a Concrete Bus Pad Installation Project Read More »

On-call Civil Engineering Services

SCOPE OF SERVICES The City of Lawndale desires to enter into contracts with one or more highly qualified Engineering firms for services on an as-needed basis. The City’s use of consultant services is on an as-needed basis so that if the demand is not there, the services will not be requested. For each on-call service request, the consultant and the City will agree upon the specific scope of work and cost for that project. The City has the right to retain other consulting firms in its sole discretion when the City believes there will be an economic or other significant advantage for doing so. No minimum amount of work is guaranteed under these agreements. Compensation will be based on the time and material with a not-to-exceed limit agreed upon by both Consultant and the City before work begins.

On-call Civil Engineering Services Read More »

Solar Projects at Three SJC Community Centers

SCOPE OF WORK: Design, Permitting, Construction, Interconnection, Commissioning, and Closeout 39.3 (+) KW Flush Mount Racking on Sloped Asphalt shingle roof. South Facing. Modules, Inverters, MLPE, and SCADA. County to provide requirements. Future Scope for 19.2KW level 2 and 50KW Level 3 fast EV Chargers. (MCBs Only) SCADA System to include Point of Irradiance, Back Module Temp, Inverter Communications, and PV Revenue meter. 30KWH Battery Storage (inverter integrated) Lodi Electric Interconnection. Architectural and Electrical Design by EJQ Electrical Engineering, by San Joaquin Co. Structural Design. State design criteria and energy to meet 1st year 65,000 KWH minimum. Performance model to show shading losses.

Solar Projects at Three SJC Community Centers Read More »