*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Solar Projects at Three SJC Community Centers

SCOPE OF WORK: Design, Permitting, Construction, Interconnection, Commissioning, and Closeout 39.3 (+) KW Flush Mount Racking on Sloped Asphalt shingle roof. South Facing. Modules, Inverters, MLPE, and SCADA. County to provide requirements. Future Scope for 19.2KW level 2 and 50KW Level 3 fast EV Chargers. (MCBs Only) SCADA System to include Point of Irradiance, Back Module Temp, Inverter Communications, and PV Revenue meter. 30KWH Battery Storage (inverter integrated) Lodi Electric Interconnection. Architectural and Electrical Design by EJQ Electrical Engineering, by San Joaquin Co. Structural Design. State design criteria and energy to meet 1st year 65,000 KWH minimum. Performance model to show shading losses.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 01/25/2024 – 2:00 PM
Pre-Bid Mtg: Yes – Non-Mandatory
Pre-Bid Mtg Date: 01/03/2024 – 2:00 PM
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #: n/a

Lourdes Piojo Dean 209-468-3263
lpiojo@sjgov.org

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 01/25/2024 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.