Tanner Clearwell Replacement (TAN 1A.3)
PROJECT DESCRIPTION The existing Tanner Water Treatment Plant (WTP) does not have sufficient reliable storage capacity to meet the needs of the existing customers and commitments, nor can the WTP reliably meet the permitted WTP capacity of approximately 6 MGD with the existing treatment plant or storage facility. The sole existing storage facility, besides having no redundancy or backup, has numerous deficiencies, as discussed in the above referenced studies. The Tanner Clearwell Replacement Project (TAN 1A.3), as described in the Capacity Study, proposes to install a 3.0 million gallon potable water storage tank per AWA & State requirements, standards and recommendations.
Tanner Clearwell Replacement (TAN 1A.3) Read More »