Tanner Clearwell Replacement (TAN 1A.3)

PROJECT DESCRIPTION The existing Tanner Water Treatment Plant (WTP) does not have sufficient reliable storage capacity to meet the needs of the existing customers and commitments, nor can the WTP reliably meet the permitted WTP capacity of approximately 6 MGD with the existing treatment plant or storage facility. The sole existing storage facility, besides having no redundancy or backup, has numerous deficiencies, as discussed in the above referenced studies. The Tanner Clearwell Replacement Project (TAN 1A.3), as described in the Capacity Study, proposes to install a 3.0 million gallon potable water storage tank per AWA & State requirements, standards and recommendations.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 06/11/2024 – 2:00 PM
Pre-Bid Mtg: Yes – Non-Mandatory
Pre-Bid Mtg Date: 05/08/2024 – 2:00 PM
Engineer’s Est: We requested the engineer’s estimate from the agency on 04/30/2024. Follow this project to receive further updates.
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:WO# 7324104

Brandt Cook (209) 257-5206
bcook@amadorwater.org

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 06/11/2024 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.