Soledad Community Center Building Modernization Project

Description: A partial list includes the following: Selective Demolition, Kitchen remodel, Restroom remodel, Stage Lift, Accessibility Upgrades (parking, signs, doors, hardware, etc), Electrical, Mechanical & Plumbing Base Bid Kitchen Remodel ADA upgrades (Parking, Site, Doors) Separate Line Items to Base Bid Stage Lift Stage electrical/lighting Bid Alternates: Gym Lighting Restroom Remodel Site Work: Trash Enclosure, Site Lighting

Soledad Community Center Building Modernization Project Read More »

Vacaville Campus – Water Intrusion Project

DESCRIPTION The items of work indicated below propose modifications to, substitutions for, additions to and/or deletions from the various parts of the Work specified in other Sections of the Specifications. The acceptance or rejection of any of the alternates is strictly at the option of the District subject to the District’s acceptance of the Contractor’s stated prices contained in this Proposal.

Vacaville Campus – Water Intrusion Project Read More »

Fairfield Campus – B1400 Mdoernization Phase I Roof Project

DESCRIPTION The items of work indicated below propose modifications to, substitutions for, additions to and/or deletions from the various parts of the Work specified in other Sections of the Specifications. The acceptance or rejection of any of the alternates is strictly at the option of the District subject to District’s acceptance of Contractor’s stated prices contained in this Proposal.

Fairfield Campus – B1400 Mdoernization Phase I Roof Project Read More »

Design of a New Seaside Welcome Sign

SCOPE OF WORK The City of Seaside is seeking assistance with concept design, development design and construction documents for a Welcome to Seaside sign. The selected firm will be responsible for carrying out all aspects of the design. Based on the guidelines outlined in Task 1, and on an analysis of the respective sign location, develop preliminary designs for a new “Welcome to Seaside” sign and deliver to city staff. A mock up image of the sign design at the proposed locations should be included in the design package. Based on city staff review of the preliminary design plan, amend design if needed and prepare a final sign plan, for city approval.

Design of a New Seaside Welcome Sign Read More »

Boronda Road Congestion Relief Project – Phase 1

Scope of Work: The Phase 1 Project includes widening and intersection improvements of approximately 0.7 miles of East Boronda Road between Dartmouth Way and 1,700 feet east of McKinnon Street intersection, including a new multi-lane roundabout at the McKinnon Street and Boronda Road intersection. Work also includes but is not limited to: construction of storm water treatment facilities and bioretention facilities in the roadway medians, islands, and adjacent to sidewalks, construction of shared-use paths around the perimeter of the roundabout, construction of bike lanes, bus pullouts, street lighting, sidewalks, ADA pedestrian access ramps, installation of storm drain lines, sanitary sewer mainline extension, pavement delineation, roadway signs, landscaping, and all other improvements and requirements as described and specified in the project Plans and these Contract Documents.

Boronda Road Congestion Relief Project – Phase 1 Read More »

Instrument House Repair (Folsom Blvd and Zinfandel Drive)

General work description: Contractor must provide repairs to the damaged steel crossing instrument house located at the southeast corner of the intersection of Folsom Blvd and Zinfandel Drive in the City of Rancho Cordova. Upon Contract execution, Contractor must make an initial assessment of the damage and take the necessary measurements needed to repair the instrument house. SacRT staff does not have the technical expertise or knowledge to provide the exact measurements of the damaged area.

Instrument House Repair (Folsom Blvd and Zinfandel Drive) Read More »

Easter Bowl and Glenloch Tanks Seismic Improvement and Roof Repair Project

SCOPE OF WORK Work under this Section consists of furnishing all labor, materials, equipment, tools, and services required to supply and install a roof vent that allows the adequate passage of air into and out of the tank, prevents the entry of animals and insects, and provide automatic pressure relief in the event of screen blockage

Easter Bowl and Glenloch Tanks Seismic Improvement and Roof Repair Project Read More »

1525 Connecticut Drive Creek Wall Repair Project

Description: The work of this project consists generally of without limitation, full repair of damaged creek wall at a trapezoidal concrete lined channel. Contract Documents fully describe the Work. Work shall be completed within 75 Calendar Days from the date when Contract Time commences to run. The contractor is advised that Contract Time is tentatively scheduled to commence on May 28th, 2024.

1525 Connecticut Drive Creek Wall Repair Project Read More »

Fy 2023-24 City-wide on-call Striping and Signage

DESCRIPTION OF WORK ñ In general the project consist of a variety of on call striping projects which could include refreshing striping on existing collectors and arterials to quick build striping projects. Examples of the type of quick build projects include intersection treatments along Garfield Drive or Jefferson Street, crosswalk improvements at Ely Boulevard South and Caulfield Lane, Monroe Street at Tahola Lane or Magnolia Avenue at Pepperwood Lane.

Fy 2023-24 City-wide on-call Striping and Signage Read More »