Projects for The Amador Water Agency – California.



Total Results: 9

Entry Date: Post ID: Project Title: Project #: Bid Date: Documents:
04/30/2024 232337 Tanner WTP Flow Control & Reliability Improvements (TAN 1B.1) WO# 7324105 06/25/2024
04/30/2024 232334 Tanner Backwash Drying Beds (TAN 1A.11) WO# 7324106 06/18/2024
04/30/2024 232331 Tanner Clearwell Replacement (TAN 1A.3) WO# 7324104 06/11/2024
04/30/2024 232328 Ione Backwash Handling Improvements WO# 7424109 06/04/2024
04/10/2024 229363 Ione Backwash Handling Improvements (IONE 1A.9) WO# 7424108 & 7424107 05/07/2024
04/10/2024 229365 Ione Reliability Capacity Expansion Project (IONE 1A.8) and Ione Site Security & Access Improvements (IONE 1A.4) WO# 7424108 & 7424107 05/07/2024
03/26/2024 227028 Cathodic Protection Upgrades – Transmission Pipelines 04/09/2024
03/11/2024 224251 La Mel – Packaged Booster Pump Station 04/02/2024
03/11/2024 224254 Generator Prepurchase 04/02/2024