Fuel Tank Testing, Analysis, and Cleaning Services
Scope of Work FUEL TANK TESTING, ANALYSIS, AND CLEANING SERVICES
Fuel Tank Testing, Analysis, and Cleaning Services Read More »
Scope of Work FUEL TANK TESTING, ANALYSIS, AND CLEANING SERVICES
Fuel Tank Testing, Analysis, and Cleaning Services Read More »
THIS PROJECT INCLUDES INVITATION FOR BID (IFB) NOTICE TO PROSPECTIVE BIDDERS FIRE EXTINGUISHER MAINTENANCE, INSPECTION, TESTING, RECHARGE/REFILL, AND REPAIR SERVICES
FIRE EXTINGUISHER MAINTENANCE, INSPECTION, TESTING, RECHARGE/REFILL, AND REPAIR SERVICES Read More »
Scope of Services California State University of San Bernardino is requesting vendors to submit proposals for sealing and striping of two parking lots. Parking Lot A (approx. 91,191 square feet) and Parking Lot M (approx. 25,811 square feet). The purpose is to fill all cracks, seal the asphalt and restripe the parking areas.
PARKING LOT M AND LOT A – RESTRIPING AND RESEALING Read More »
PROJECT DESCRIPTION The goal of the project is to design the construction of one (1) groundwater well and two (2) monitoring wells in the Chino Basin, as shown in Attachment “A”, or in a nearby similar location as determined by the Authority. The scope of work includes: Preparing and/or validating the current CDA PDR and extraction well and monitoring well design documents, Creating a bid package for well drilling and well construction, and Performing inspection and field oversight during well development and construction.
Design of CDA Well II13 and Monitoring Wells II-MW-6 and II-MW-7 Read More »
SCOPE OF WORK: The City of Victorville is looking to replace an aging CNG compressor and motor located at the McArt CNG Station. The City is replacing the complete CNG Skid Package. One of the requirements for the new skid replacement package is to increase the output SCFM from 196 to a minimum of 380 SCFM
FURNISH AND DELIVER MCART CNG STATION SKID REPLACEMENT Read More »
SCOPE OF WORK. South Coast Water District (SCWD) is organized as a Special District under the laws of the State of California to provide water and wastewater services to residents and businesses within an 8.3 square mile area along a stretch of the Pacific coast in south Orange County. Its current boundaries resulted from the consolidation of three districts: South Coast Water District (District), Capistrano Beach Water District (CBWD), and Dana Point Sanitary District (DPSD). It serves the communities of South Laguna, Monarch Beach, Dana Point, Capistrano Beach, north coastal San Clemente and southernmost San Juan Capistrano.
PREQUALIFICATION OF BIDDERS FOR PAVING SERVICES CONTRACTOR Read More »
SCOPE OF WORK. The Contractor shall perform within the time stipulated the contract as herein defined, and shall provide all labor, materials, tools, utility services, and transportation to complete in a workmanlike manner all of the work required in connection with the following titled project: REQUEST FOR PROPOSALS NO. 2023-4 ORGANIC WASTE/WASTE REMOVAL AND RECYCLING SERVICES
ORGANIC WASTE/WASTE REMOVAL AND RECYCLING SERVICES Read More »
SCOPE OF WORK The selected consultant shall demonstrate sufficient understanding of construction methods and practices to successfully guide this project through the construction process. The following is a preliminary scope of services. The consultant should revise and/or expand on this scope in accordance with their expertise. Sufficient detail shall be provided in the scope of work submitted by the consultant to outline all work required to complete construction of the project.
PROJECT DESCRIPTION The work to be done consists of furnishing all materials, equipment, tools, supervision, labor and incidentals required to complete the above stated project. The work includes removal, recycling, and replacement of failed asphalt concrete, installing asphalt concrete overlays, slurry seals, berms, pavement markings and lane striping replacements, traffic control, and public notification as described in the specifications. Construct or reconstruct concrete curbs, gutters, sidewalks and pedestrian ramps. List of overlay and slurry seal streets, locations, description of work, estimated quantities and a vicinity map is attached as exhibits. Separate plans are referenced in the bid document.
2024 Street Maintenance & Repairs Read More »
PROJECT DESCRIPTION: The proposed work shall be performed in accordance with the project specifications, City standards and other contract documents and consists of the following: Furnish and Install New Fluorescent Yellow-Green Signs Furnish and Install New Signs with Solar Power LED Rectangular Rapid Flashing Beacons (RRFBs) Furnish and Install New Solar Power LED Flashing Signs Furnish and Install Solar Power LED Speed Feeback Signs Relocation of existing signs Traffic Control
MIDLAND ROAD SAFETY IMPROVEMENTS Read More »