Environmental Construction, Inc.

Requesting sub-bids from the following qualified firms: DBE, WBE, MBE, DVBE, SBE, SLBE, ELBE for the following project.

RFP for DBE Subcontractor & Suppliers | West Hollywood – Pan Pacific Retention Basin Diversion Gate & Control House Upgrade

Project Information

Bid Date: 10/05/2021 - 11:00AM

DBE Proposal Due Date: 10/04/2021 - 4:00PM

Owner (Agency): County of Los Angeles - Public Works Division

Number (Agency): 9408

County: Los Angeles

Location: West Hollywood, CA, USA

Contact Information

Name: Lauren Lustyan

Phone: 1(818) 449-8920

Fax: n/a

Website: n/a

Address: 21550 Oxnard St., Suite 1060

Advertised DBE Scope of Work

Environmental Construction, Inc. (“ECI”) seeks DBE subcontractors and suppliers for the County of Los Angeles West Hollywood - Pan Pacific Retention Basin Diversion Gate & Control House Upgrade project. This is a prevailing wage project in the City of West Hollywood with an estimated cost between $2,700,000 - $4,000,000. The project involves the following scopes of work: • SHORING OF OPEN EXCAVATIONS • REMOVAL AND DISPOSAL OF LBP/LCP • ASBESTOS ABATEMENT • REMOVAL AND DISPOSAL OF ASBESTOS-CONTAINING MATERIAL • PREPARATION OF DEBRIS CONTAINMENT AND COLLECTION PLAN • IMPLEMENTATION OF DEBRIS CONTAINMENT • PREPARATION OF SITE-SPECIFIC LEAD COMPLIANCE PLAN • IMPLEMENTATION OF SITE-SPECIFIC LEAD COMPLIANCE PLAN • REMOVAL AND RECYCLING OF UNIVERSAL WASTE • PREPARATION OF THE DIVERSION OF WATER PLAN • IMPLEMENTATION OF THE DIVERSION OF WATER PLAN • OFFICE FACILITIES • CLEARING AND GRUBBING • TREE REMOVAL • CONCRETE REMOVAL • DEMOLITION OF CONTROL HOUSE • REMOVE EXISTING SPILLWAY BARRIER • REMOVE EXISTING STEEL FENCE • SEAL AND ABANDON EXISTING MANHOLE • UNCLASSIFIED EXCAVATION • STRUCTURE EXCAVATION (RETAINING WALL) • STRUCTURE BACKFILL (RETAINING WALL) • CRUSHED MISCELLANEOUS BASE • AC PAVEMENT (PATCH BACK) • PCC PAVEMENT • MODIFIED DRIVEWAY • MODIFIED PCC WALL GUTTER • REINFORCED CONCRETE • STRUCTURAL STEEL • MISCELLANEOUS METAL • DRILL AND BOND ANCHOR (EPOXY CARTRIDGE) • CONTROL HOUSE • SPILLWAY BARRIER WITH ACCESS GATE • GALVANIZED STEEL PICKET FENCE • GALVANIZED STEEL SLIDE GATE • 1" THICK GALVANIZED STEEL PLATE • AUTOMATIC SLIDE GATE OPERATOR • ELECTROMAGNETIC GATE LOCK • KEYPAD PER DETAIL "K" • PRECAST CONCRETE UTILITY VAULT • DIRECTIONAL DRILL 6" HDPE CONDUIT • DIRECTIONAL DRILL 8" HDPE CONDUIT • ADDITIONAL POTHOLING • ELECTRICAL WORK • REMOVAL OF EXISTING MECHANICAL EQUIPMENT • FURNISH AND INSTALL FABRICATED STAINLESS STEEL SLIDE GATE • FURNISH AND INSTALL HYDRAULIC POWER UNIT AND ACTUATOR • FURNISH AND INSTALL HYDRAULIC LINES AND PIPE FITTINGS • FURNISH AND INSTALL OVERHEAD UTILITY PIPES ENCLOSURE • OPERATIONAL TEST • MISCELLANEOUS MECHANICAL WORKS • INVESTIGATE UNKNOWN CONDUITS • RELOCATE UNKNOWN CONDUIT • REMOVE EXISTING SEWER CLEANOUT • SEWER CLEANOUT • FURNISH AND PLANT 36" BOX TREE • PLANT ESTABLISHMENT PERIOD • AIR VENT PIPE • FURNISH AND INSTALL UTILITY BOX WITH CONCRETE LID ECI seeks proposals for any and all items of work. Please send proposals by October 4, 2021 to estimating@environcon.com or fax 818-805-3558. Please email estimating@environcon.com or call 818-449-8920 for the bidding documents for this project or you may download them from the County of Los Angeles website. ECI will provide you with information about the Plans, Specifications, and requirements for any selected subcontracting or material supply work. In addition, ECI will help you obtain required bonds, lines of credit, or insurance. Please call or email and tell us how we can help. Lauren Lustyan Contract Administrator Environmental Construction, Inc. CSLB No. 498624 DIR No. 1000009515 21550 Oxnard Street, Suite 1060 Woodland Hills, CA 91367 Phone: 818-449-8920 Fax: 818-805-3558

Where to find the plans & specs?

Contact Us