Stacy and Witbeck, Inc.

Requesting sub-bids from the following qualified firms: DBE for the following project.

Del Mar Bluffs Stabilization Project 5 (DMB5)

Project Information

Bid Date: 10/12/2023 - 2:00 PM

DBE Proposal Due Date: 10/20/2023 - 2:00 PM

Owner (Agency): San Diego Association of Governments (SANDAG)

Number (Agency): SOL1194705

County: San Diego / Imperial

Location: Del Mar, CA 92014, USA

Contact Information

Name: Kyle Sills

Phone: 310.497.7224

Fax: 510.748.1205

Website: Stacy and Witbeck, Inc.

Advertised DBE Scope of Work

Stacy and Witbeck, Inc. is requesting quotes from DBE firms, certified and qualified subcontractors and suppliers for the following items of work, including but not limited to SWPP Plan, Environmental Compliance, CIDH Piles, Soldier Piles, Tie Back Anchors & Soil Nails, Wall Lagging, Sawcutting, Landscape & Irrigation, Shotcrete, Guardrail, Underground Utilities, Precast (Furnish & Install), Minor Concrete (Ditch), Reinforcing Steel, Erosion Control, Potholing, Signage (Furnish & Install), Temporary Fence, Aggregate Crushed Base (Furnish & Install), Pipe Lining, Pedestrian Protective Railing (Cable Railing), QA/QC, Survey, Trucking, Dump Fees, Concrete Pumps, Street Sweeping, Ready Mix Concrete, Aggregates, Pipe (PVC, RCP, HDPE), Miscellaneous Metal, Precast Drainage (Furnish), Precast Lagging (Furnish), Signs (Furnish), H-Piles (Furnish), Aggregate Crushed Base (Furnish), Environmental Compliance Officer and Jobs Coordinator. Stacy and Witbeck, Inc. will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. The project includes a 17.16% DBE Goal. Plans and specs including the bid package and any addenda modifying the project plans and manuals are located in the Files tab in BuildingConnected, or you can also access the documents at our public Box site: https://stacywitbeck.box.com/s/dranr5wljzvfq9f22g2cmenxg2pz59yw All subcontractors must possess a current contractor’s license, insurance, and worker’s comp insurance coverage meeting Stacy and Witbeck’s requirements. A copy of the insurance requirements and agreements can be obtained by contacting the estimator. In addition, subcontractors are required to register with the Department of Industrial Relations (DIR), as required by Public Contract Code Section 1725.5, please furnish the DIR number with your quote submittal. Include applicable DBE certifications issued and validated by pertinent agencies. Stacy and Witbeck, Inc. is an Affirmative Action/EEO company and is willing to assist qualified certified DBE and other small business certified firms to achieve our subcontractor/supplier goals. Subcontractors will be required to provide a 100% performance and 100% payment bond for the full amount of the subcontract price. Items of work may be broken down into economically feasible packages to encourage participation. Please also provide bond rates with your submitted bids. In some cases, we may be able to provide assistance obtaining bonds, line of credit, insurance, necessary equipment, supplies, and materials, as well as any related assistance in services to subcontractors who may otherwise be at a disadvantage. Additional Information: DBE must be certified by the California Unified Certification Program (CUCP) and must be listed as a certified DBE on the CUCP website: https://caltrans.dbesystem.com.

Where to find the plans & specs?

Contact Us