04/08/2021 |
Environmental Construction, Inc. |
Pacoima Spreading Grounds Basin Enhancement Project |
DBE, WBE, MBE, DVBE, SBE, SDBE, SMBE, SLBE |
04/20/2021 – 11:00AM |
Los Angeles |
04/01/2021 |
Environmental Construction, Inc. |
Walteria Retention Basin Improvements Phase I in the City of Torrance |
DBE, WBE, MBE, DVBE, SBE, SDBE, SMBE, SLBE |
04/13/2021 – 11:00AM |
Los Angeles |
03/31/2021 |
Environmental Construction, Inc. |
Laguna Regulating Basin Slope Repair and Access Road Improvements |
DBE, WBE, MBE, DVBE, SBE, SDBE, SMBE, SLBE |
04/13/2021 – 11:00AM |
Los Angeles |
03/26/2021 |
Environmental Construction, Inc. |
Bradbury Channel Repair Project |
DBE, WBE, MBE, DVBE, SBE, SLBE |
04/06/2021 – 11:00AM |
Los Angeles |
03/25/2021 |
CT&T Concrete Paving Inc. |
ADA Access Improvments and Parking Lot Pavement Replacement at Fullerton Park and Ride |
DBE |
04/05/2021 – 11:00 AM |
Orange |
03/25/2021 |
CT&T Concrete Paving Inc. |
E700238F – Active Transportation Program (ATP) Cycle 2: Boyle Heights Pedestrian Linkages |
DBE |
04/07/2021 – 10:00AM |
Los Angeles |
03/24/2021 |
Jilk Heavy Construction, Inc |
Laguna Regulating Basin Slope Repair and Access Road Improvement |
Other |
04/13/2021 – 11:00 AM |
Los Angeles |