Projects for Santa Rosa, City of



Total Results: 43

Entry Date: Post ID: Project Title: Project #: Bid Date: Documents:
12/01/2023 210068 RFQ 23-68 Tree Removal RFQ 23-68 12/14/2023
11/21/2023 208690 Hearn Ave Abatement and Demolition – 1004, 980, 976 C02460 12/13/2023
11/17/2023 208398 Plumbing Services RFQ 23-65 12/07/2023
11/03/2023 206567 Delta Pond Standby Generator & Annex Boiler # 1 Replacement 11/20/2023
10/06/2023 202586 Laguna Treatment Plant Electrical Infrastructure Improvements 11/14/2023
09/25/2023 200626 Fiber Optic Installation S7 TO R7 IFB 23-55 10/25/2023
09/22/2023 200518 Finley Community Center Floor Replacement 23-56 10/16/2023
09/22/2023 200521 Design-build Services for Fulton Rd Riparian Habitat Mitigation C02439 10/11/2023
08/25/2023 196541 (RFP) #R163240 Electric Vehicle Fleet Infrastructure Master Plan R163240 09/25/2023
09/01/2023 197418 Fire-Damaged Tree Removal – Parks, Open Space, ROW Phase 3 C02338 09/25/2023
08/23/2023 196023 2023 Pavement Markings C02450 09/20/2023
09/08/2023 198555 Iron Sponge Media Removal, Replacement, and Disposal Services 23-54 09/18/2023
08/09/2023 194039 Improvements to Martin Luther King Jr. Neighborhood Park and Adjacent Newhall Pedestrian and Bike Trail Park R163583 09/14/2023
08/23/2023 196029 Emergency Operation Center Structural Seismic Retrofit 09/13/2023
08/23/2023 196026 Bid # R163629 South Santa Rosa Specific Plan R163629 09/11/2023