Projects for Coachella Valley WD



Total Results: 21

Entry Date: Post ID: Project Title: Project #: Bid Date: Documents:
03/19/2024 225725 Marriott Shadow Ridge, Low-Pressure, and Emerald Desert Non-Potable Water Pipelines 2022-42 05/29/2024
05/07/2024 233366 Pipe Condition Assessment Pilot Study 2024-15 05/24/2024
04/03/2024 228379 Valley View Trunk Sewer Design 2024-09 04/26/2024
03/19/2024 225722 Non-Hazardous Waste Brine Transportation and Disposal RFB No. 2024-6 04/10/2024
02/20/2024 220912 Landscaping Services 2024-4 03/14/2024
02/16/2024 220359 Well Rehabilitation Project, Phase 3,Well 5662-1 2023-44 03/05/2024
01/17/2024 215457 Palm Desert Operations Parking Lot Rehabilitation – Phase 2 Project 2023 - 29 02/08/2024
11/28/2023 209592 Comprehensive Compensatory Mitigation Planning 2023-46 01/12/2024
11/28/2023 209589 Avenue 66 Trunk Sewer Design – Final Engineering Services 2023-50 01/05/2024
11/22/2023 208998 Evaluation of Options to Comply with California’s Proposed Hexavalent Chromium Maximum Contaminant Level 2023-49 12/18/2023
10/27/2023 205487 Water Reclamation Plant No. 7 Aeration Improvements Project 2022-24 12/13/2023
10/27/2023 205472 Lift Station 55-11 Capacity Upgrade Project 2022-18 11/29/2023
09/29/2023 201664 Refurbishment of Secondary Clarifiers at Water Reclamation Plant NO. 10 11/01/2023
08/14/2023 194505 Avenue 66 Transmission Water Main, Phase 1B, Phase 2, and Lincoln Street Water Main Project 2023-23 10/24/2023
08/29/2023 196911 Furnish and Installation of an Inductively Coupled Plasma Mass Spectrometer (ICP-MS) System 2023-28 09/06/2023