Projects for Beaumont-Cherry Valley Water District
Entry Date: | Post ID: | Project Title: | Project #: | Bid Date: | Documents: |
---|---|---|---|---|---|
03/28/2024 | 227355 | 3040 Pressure Zone Cherry Avenue/ International Park Road Transmission Pipeline | 05/07/2024 | ||
09/12/2023 | 198914 | Construction of Wells 1A AND 2A | 10/05/2023 | ||
08/16/2023 | 194953 | 2850 Pressure Zone Booster Pump Station and Transmission Pipeline Project | 09/13/2023 | ||
06/13/2023 | 185713 | Design and Engineering Services for the 2023 Water Pipelines Project | 07/06/2023 | ||
06/14/2023 | 185928 | Design and Engineering Services for the 2023 Water Pipelines Project | 07/06/2023 |