Murray Field Airport Rehabilitate Runway 12/30, Taxiway A, and Taxiway A1 – A4
SCOPE OF WORK: Site mobilization; initial site clean-up; site preparation; removal of asbestos-containing materials from walls and ceilings; or from
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Jonathan Leggett 714-412-5714
jleggett@anaheim.net
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
SCOPE OF WORK: Site mobilization; initial site clean-up; site preparation; removal of asbestos-containing materials from walls and ceilings; or from
Scope of Services The work to be performed under this contract consists of header & slot grinding existing pavement, placement
Scope of Services The scope of work for this project consists of the rehabilitation of approximately 20,000 linear feet of
SCOPE OF WORK:The scope of work for this study is presented in OGI’s proposal dated February 14, 2022, which was
Scope of Services: The selected firm will conduct a detailed assessment and analysis of the storm drain system in Grand
SCOPE OF SERVICES The following generalized task descriptions are presented as information only to assist consultants in preparing a proposal.
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.