*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Toland Road Landfill Phase 4c Liner Expansion

SCOPE OF WORK:The scope of work for this study is presented in OGI’s proposal dated February 14, 2022, which was incorporated into Dragomir Design-Build (DDB) Work Order (WO) No. 4, dated September 2, 2022, and WO No. 4, Change Order Numbers 1 and 2 dated June 2. 2023 and January 29, 2024, respectively. This report addresses Tasks 1 and 2 of WO No. 4 consisting of field exploration, laboratory testing, a focused discussion on the interpreted geologic conditions and earth material properties in the proposed Phase 4C liner area based on work performed, and slope stability evaluations for seven geologic cross sections (A-A’ through G-G’). Change Order No. 1 to WO No. 4 dated June 2, 2023, authorized an additional drill hole, EPAR-1, on the East Perimeter Access Road south of Phase 4C, as well as supplemental laboratory testing and evaluations. The purpose of the Change Order No.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 05/22/2024 – 2:00 PM
Pre-Bid Mtg: Yes – Mandatory
Pre-Bid Mtg Date: 05/08/2024 – 10:00 AM
Engineer’s Est. Min: $11295150
Engineer’s Est. Max: $11295150

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:BID NO. 24-001

Richard Jones
RichardJones@VRSD.com

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 05/22/2024 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.