*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Post Chlorination & Static Mixer Vault at Lester Water Treatment Plant

Scope of Services The project includes, but is not limited to, construction of new large diameter steel piping and a cast-in-place open-top concrete vault with a new magnetic meter, static mixer, and chlorine and ammonia injection downstream from the treatment plant’s filters.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 04/23/2024 – 2:00 PM
Pre-Bid Mtg: Yes – Mandatory
Pre-Bid Mtg Date: 03/19/2024 – 9:00 AM
Engineer’s Est. Min: $1000000
Engineer’s Est. Max: $1200000

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:NIB 24-071CA

Carol Appelt 951-279-3620
carolyn.appelt@coronaca.gov

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 04/23/2024 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.