Lynwood High School Imperial Campus New Classroom Building
Project Description Project Scope Summary. The Project is a 3-story 156,384 square-foot facility with 71 classrooms. The classroom count includes
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Nickole Covarruvias (209) 937-7261
Nickole.Covarruvias@stocktonca.gov
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
Project Description Project Scope Summary. The Project is a 3-story 156,384 square-foot facility with 71 classrooms. The classroom count includes
Scope of Services Furnish All Labor, Material and Equipment for the roofing repairs at the Tibor Rubin Library located at
SCOPE OF WORK The scope of work for the geotechnical exploration was presented in our proposal dated November 15, 2023
SCOPE OF WORK The purpose of this solicitation is to obtain one (1) Certified Arborist/Forester to patrol and inspect REU’s
Description: The Project is located at various locations in the City of Pittsburg. The streets are in the southwestern quadrant
Project Description: This project includes demolition and reconstruction of the existing kitchen, including casework, countertops, appliances, non-structural walls, MEP systems,
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.