Grossmont College Perimeter Road Phase II
Scope of Work – The scope of the Grossmont College Perimeter Road Repair Phase II will include a pavement condition
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
David Bond (626) 744-7150
dbond@cityofpasadena.net
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
Scope of Work – The scope of the Grossmont College Perimeter Road Repair Phase II will include a pavement condition
SCOPE OF SERVICES The full scope of anticipated services is described in detail below. The selected firm may be asked
Scope of Services The City of Riverside (“City”) is seeking to pre-qualify general contractors (“Contractor” or “Company”) to be eligible
SCOPE OF SERVICES The City of Alameda (“City”) is requesting proposals from qualified organizations for Tree Maintenance in the Harbor
The Project consists of: Asphalt paving rehabilitation to include mill and removal of two (2) inches of existing asphalt section
Scope of Services THE OBJECTIVE OF THE CHANDLER BIKEWAY EXTENSION PROJECT IS TO EXTEND THE EXISTING CHANDLER BIKEWAY FROM ITS
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.