*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Pleasanton Middle School Hardcourt Rehabilitation

The Project consists of: Asphalt paving rehabilitation to include mill and removal of two (2) inches of existing asphalt section replaced with new asphalt overlay over hardcourt area. Application of acrylic surfacing and restriping of various athletic courts as shown. Fencing/Sitework associated with paving work as shown per plans and specifications by Verde Design dated 4/26/24.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 05/28/2024 – 2:30 PM
Pre-Bid Mtg: Yes – Mandatory
Pre-Bid Mtg Date: 05/09/2024 – 10:00 AM
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:2023-24.16

Stephen Goltiao
stephen.goltiao@cumming-group.com

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 05/28/2024 – 2:30 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.