On- Call Construction Management Services
DESCRIPTION: The City of Orinda is situated in the Oakland/Berkeley hills immediately east of the Caldecott Tunnel on Highway 24
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Erin Adams (760) 643-5415
eadams@ci.vista.ca.us
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
DESCRIPTION: The City of Orinda is situated in the Oakland/Berkeley hills immediately east of the Caldecott Tunnel on Highway 24
SCOPE OF WORK Attention is directed to Section 4 of the Standard Specifications. The intent of the Plans and Specifications
Scope of Work The City of Ukiah requests bids that include all necessary materials, equipment and labor to remove one
DESCRIPTION OF WORK EST. QTY. UNIT UNIT PRICE TOTAL COST Mobilization Temporary Traffic and Pedestrian Control Demolition Sheeting, Shoring, &
SCOPE OF WORK SCOPE OF WORK FOR MARK THOMAS DRIVE AND SLOAT AVENUE SEPARATED BIKE/PEDESTRIAN PATH STUDY, PRELIMINARY DESIGN, AND
SCOPE OF WORK: The Major Street Rehabilitation Program will consist of: 1) construction surveying; 2) 377,000 S.F. of 2 ½”
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.