*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
Concrete Sidewalk Slicing
- Post ID: 193570
- Posted: 08/07/2023
- Updated: 08/17/2023
Project Information
*BidAmerica Membership is required to view all information.*
Agency Information
*BidAmerica Membership is required to view the agency contact information.*
Mara Romano 619-441-1787
mromano@elcajon.gov
Documents Available
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
Other Projects
Toland Road Landfill Phase 4c Liner Expansion
SCOPE OF WORK:The scope of work for this study is presented in OGI’s proposal dated February 14, 2022, which was
El Estero Water Resource Center Electrical Distribution Renewal Project
Scope of Services The Project will replace the existing medium and low-voltage distribution equipment with new equipment. The Project will
Traffic Signal Modification at Baker Street and Babb Street
Scope of Services The scope of work generally consists of modifying the existing traffic signal at the intersection of Baker
MULTIMODAL CORRIDOR FEASIBILITY STUDY
SCOPE OF WORK Request for Proposals (RFP) 4-2171 – State Route 73 (Bison Avenue to Interstate 405) Multimodal Corridor Feasibility
Agency-wide Anaerobic Digester Cleaning Services, Project No. EN22024
SCOPE OF WORK IEUA will shut down one digester system at a time and make it available for the Contractor
Questions / Comments
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.