*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Spec 21-01 Great Redwood Trail Phase 4

SCOPE OF WORK The work includes the design and construction of a Class I trail along the Great Redwood Trail Agency (GRTA) corridor between Commerce Drive and Plant Road in Ukiah, CA. Where the trail intersects road crossings, at Airport Road, Norgard Lane and Plant Road, there will be intersection improvements that include striping, signage, crosswalks, ramps, sidewalks, lighting, signing and striping. The work includes clearing and grubbing, demolition, SWPPP implementation, erosion controls and BMPs, drainage, excavation, fill, grading, compaction, retaining wall, pedestrian ramps, asphalt paving, striping, signing, lighting, flashing beacons and related improvements. The work is within the State Right-of-Way and City Right-of-Way

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 04/23/2024 – 2:00 PM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:21-02

Myles Fisette (707) 463-6225
mfisette@cityofukiah.com

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 04/23/2024 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.