*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

San Gabriel River Greenway and Neighborhood Connection

Project Description – The general nature of work consists of furnishing all labor, material, equipment, services, and incidentals required for improvements, landscaping, construction of new asphalt concrete and concrete pavement, construction of a curb drain, construction of solar lighting, construction of solar security cameras, construction of fencing, construction of benches, construction of bicycle repair stations, construction of hydration stations/drinking fountains, construction of irrigation, and installation of native plantings. for a 2.3 mile long bike-way/pedestrian path that runs along the San Gabriel River from Walnut Creek Wash to Ramona Boulevard and along the Walnut Creek Wash from the San Gabriel River to Baldwin Park Boulevard.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 09/07/2023 – 2:00 PM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:CIP 20-129

David Lopez
dlopez@baldwinpark.com

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 09/07/2023 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.