Tanner Backwash Drying Beds (TAN 1A.11)
PROJECT DESCRIPTION The existing Tanner Water Treatment Plant (WTP) does not have sufficient backwash capacity (storage, recycling, pumping and sludge
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Jennifer Christoffersen 951-723-1731
jchristoffersen@cityofmenifee.us
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
PROJECT DESCRIPTION The existing Tanner Water Treatment Plant (WTP) does not have sufficient backwash capacity (storage, recycling, pumping and sludge
SCOPE OF WORK The Contractor shall adhere to all safety precautions at all times. Advanced notice is required, prior to
Description of Project shall include but is not limited to: Removal of the existing parking stripes, concrete wheel stops, speed
Scope of Work All Units Complete all Section I & II pest work as per pest report Complete all recommended
Scope of Work The City of Ukiah requests bids that include all necessary materials, equipment and labor to remove one
THIS PROJECT INCLUDES CVUSD Fun Club Installations – Rebid
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.