*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Generator Maintenance

SCOPE OF WORK The Contractor shall adhere to all safety precautions at all times. Advanced notice is required, prior to each visit, to be given to the City. All work conducted at City facilities shall be conducted from 6:30 am to 3:30 pm. A service report shall be provided for each generator inspected listing all predictive maintenance components needed to accomplish preventive and predictive maintenance. The service report shall contain all work completed as well as all follow up work with completion dates. The City shall be notified in advance when life equipment is used to accomplish maintenance of any kind. All technicians shall be properly licensed/certified as to comply with all Federal, State, and local laws, ordinances, rules, and regulations applicable to technician’s performance.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 05/09/2024 – 1:00 PM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:RFB 2023-24-004

Cristina Hall
purchasing@cityofhesperia.us

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 05/09/2024 – 1:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.