*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Oxnard Wastewater Treatment Plant (OWTP) New Maintenance Building Project

This work includes the development of plans, specifications, cost estimates, and bid documents for the OWTP New Maintenance Building Project (Project). The planning and design phase is expected to take approximately eight (8) months.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 06/01/2023 – 2:00 PM
Pre-Bid Mtg: Yes – Non-Mandatory
Pre-Bid Mtg Date: 05/09/2023 – 11:00 AM
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:PW 23-101

Michael Wolfe (805) 652-4517
michaelwolfe@oxnard.org

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 06/01/2023 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.