*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Slurry Seal Project for Arterial Streets: Muirlands Blvd. From Bake Parkway to Los Alisos Blvd. And Jeronimo Road From Bake Parkway to Los Alisos Blvd

SCOPE OF WORK The Contractor shall perform all Work within the time stipulated the contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in "COMPONENT PARTS OF THE CONTRACT" section below for the following Project: Slurry Seal Project for Arterial Streets: Muirlands Blvd. from Bake Parkway (Irvine/Lake Forest City Line) to Los Alisos Blvd. (Lake Forest/Mission Viejo City Line) Jeronimo Road from Bake Parkway (Irvine/Lake Forest City Line) to Los Alisos Blvd. (Lake Forest/Mission Viejo City Line) , PW 2021-05B The Contractor and its surety shall be liable to City for any damages arising as a result of the Contractor’s failure to comply with this obligation.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 06/06/2024 – 10:00 AM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:PW 2021-05B

Doug Erdman (949) 282-5233
derdman@lakeforestca.gov

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 06/06/2024 – 10:00 AM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.