SOQUEL CANYON PARKWAY PAVEMENT REHABILITATION – PHASE 2
DESCRIPTION OF THE WORK: The Work comprises, but is not limited to: mobilization; traffic control; 1.5-inch full-width grind and 1.5-inch
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Paul Kvam
pkvam@openspace.org
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
DESCRIPTION OF THE WORK: The Work comprises, but is not limited to: mobilization; traffic control; 1.5-inch full-width grind and 1.5-inch
Description of Work: Furnish all labor, materials, and supervision for blown in installation of Gorilla Mulch at four high school
Scope of Work. Services. Contractor shall perform the Services described in Exhibit A, subject to all terms and conditions in
SCOPE OF SERVICES CONTRACTOR shall remove submerged aquatic vegetation from Boronda Lake and remove cattails in selected areas to improve
Scope of Services The City of Indio is seeking a qualified consultant to perform as-needed professional Architectural services for a
SCOPE OF WORK: Site mobilization; initial site clean-up; site preparation; removal of asbestos-containing materials from walls and ceilings; or from
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.