*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Soquel Canyon Parkway Pavement Rehabilitation – Phase 2

DESCRIPTION OF THE WORK: The Work comprises, but is not limited to: mobilization; traffic control; 1.5-inch full-width grind and 1.5-inch AC overlay; select locations of 4-inch grind and AC overlay; 10-foot-wide feathered overlay (2” to 4”) at bridges; adjustment of utility manhole covers and water valve can covers as necessary; replacement of concrete curb ramps; replacement of concrete sidewalk, curb, gutter, spandrel, and local depressions; installation of rock blanket (with concrete mortar); and restoration of striping, pavement markings/ markers, and legends, in Soquel Canyon Parkway from Pomona Rincon Road (Bristol Lane) to north City Limit (Chino Creek bridge north of Fairfield Ranch Road), in the City of Chino Hills.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 05/30/2024 – 2:00 PM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Est: We requested the engineer’s estimate from the agency on 04/29/2024. Follow this project to receive further updates.
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:S17008

Ms. Cheryl Balz
cityclerk@chinohills.org

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 05/30/2024 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.