Construction on State Highway in the City and County of San Francisco at Various Locations From Monterey Boulevard on-ramp Overcrossing to Route 280/101 Separation
General work description: Place polyester concrete overlay, and replace joint seal.
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
purchasing@elcamino.edu
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
General work description: Place polyester concrete overlay, and replace joint seal.
THIS PROJECT INCLUDES Windmill Springs Portable addition (2)
Scope of Work – The scope of the Grossmont College Perimeter Road Repair Phase II will include a pavement condition
Scope of Work The following Scope of Work outlines the process to prepare: Updated Citywide Design Standards for single-family projects
General work description: CSP, remove culvert and cable anchorage system.
SCOPE OF WORK Install twelve (12) Elkay Drinking Fountain & Bottle Filling stations and nine Multipure Aquaform Systems Point of
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.