TRAFFIC SIGNAL MODIFICATIONS – 9 LOCATIONS HIGHWAY SAFETY IMPROVEMENT PROJECT
General work description: The project consists of a traffic signal modification including but not limited to the removal and installation
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Patricia Monesi (209) 937-8350
stocktonbids@stocktonca.gov
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
General work description: The project consists of a traffic signal modification including but not limited to the removal and installation
SCOPE OF WORK In general, the consultant shall perform professional municipal engineering services including engineering and architectural design, surveying, geotechnical
THIS PROJECT INCLUDES WILLIAM WORKMAN HIGH SCHOOL STADIUM PROJECT
Scope of Services Corner Entry Landscaping at West Valley College
Scope of Services The work to be performed consists, in general, of roadway rehabilitation by hot mix asphalt overlay and
SCOPE OF WORK Heating, Ventilation, and Air Conditioning Maintenance and Repair Services General Requirements The Orange County Transportation Authority (Authority)
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.