PW 5 Fulton Transit Improvements
PROJECT DESCRIPTION: The Work is located along Fulton Street from Arguello Boulevard to 10th Avenue in District 5 of San
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Satasia Brown
Procurement Analyst
SBCTA
1170 W. 3rd Street, 2nd Floor
San Bernardino, CA 92410-1715
(909) 884-8276
sbrown@gosbcta.com
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
PROJECT DESCRIPTION: The Work is located along Fulton Street from Arguello Boulevard to 10th Avenue in District 5 of San
DESCRIPTION : Work may include, but is not limited to the following: General structural engineering services Inspection and testing services
DESCRIPTION: The City of Orinda is situated in the Oakland/Berkeley hills immediately east of the Caldecott Tunnel on Highway 24
Scope of Work Although the final scope of work will be negotiated in the executed Agreement (defined below at subparagraph
Scope of Services The services to be performed by the contractor under this specification shall consist of furnishing all material,
SCOPE OF WORK: Reviewing and providing corrections to design reports/conditions to ensure they conform to District timelines. Preparing and providing
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.