*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Chavez High School Swimming Pool

Scope of Work Although the final scope of work will be negotiated in the executed Agreement (defined below at subparagraph F), the selected developer shall be responsible for performing the following scope of work, at a minimum: Preconstruction Services: Review design and support documentation for content, constructability, completeness, scheduling, clarity, consistency, and coordination. Undertake value-engineering analysis and prepare reports with recommendations to the District and Architect of Record to maintain established program budget and specifications. Provide detailed cost estimates. Expedite design reviews, including modifications, if any, based on value analysis. Provide a proposed Guaranteed Maximum Price (“GMP”) for the construction of the project with identified subcontractor bids and self-performed work.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 05/20/2024 – 2:00 PM
Pre-Bid Mtg: Yes – Mandatory
Pre-Bid Mtg Date: 04/30/2024 – 10:00 AM
Engineer’s Est. Min: $7000000
Engineer’s Est. Max: $7000000

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:P # 24.040

Tony Lopez
tonylopez@stocktonusd.net

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 05/20/2024 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.