Senior Center Landscape Irrigation Project
SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated the Contract and shall provide all labor,
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
CIP Engineering
CIPContracts@santa-ana.org
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated the Contract and shall provide all labor,
DESCRIPTION AND SUBMISSION: Whiting-Turner is seeking qualified Trade Contractors, for the scopes shown below, who wish to prequalify for the
DESCRIPTION OF WORK: The WORK includes the installation of new 8-inch PVC SDR-26 sewer mains, plugging and abandoning sewer mains,
DESCRIPTION OF WORK: A brief description of all Work performed on that day. A summary of all other pertinent events
Scope of Services The BID includes, but is not limited to, a survey of the entire baseball field including the
The Project consists of: Asphalt paving rehabilitation to include mill and removal of two (2) inches of existing asphalt section
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.