Mark Thomas Drive and Sloat Avenue Separated Bike/pedestrian Path Study, Preliminary Design, and Environmental Document
SCOPE OF WORK SCOPE OF WORK FOR MARK THOMAS DRIVE AND SLOAT AVENUE SEPARATED BIKE/PEDESTRIAN PATH STUDY, PRELIMINARY DESIGN, AND
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Carmen Ryan (760) 435-5108
ccryan@oceansideca.org
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
SCOPE OF WORK SCOPE OF WORK FOR MARK THOMAS DRIVE AND SLOAT AVENUE SEPARATED BIKE/PEDESTRIAN PATH STUDY, PRELIMINARY DESIGN, AND
SCOPE OF WORK IEUA will shut down one digester system at a time and make it available for the Contractor
Project Description: Bids are requested by Owner, for a general construction contract, or work described in general, as set forth
Scope of Services The contractor will provide all necessary labor, materials, and equipment to install surface-mounted campus entrance fencing onto
Scope of Services In general, the work consists of providing all labor, materials, equipment, and incidentals for the installation of
SCOPE OF WORK: Site mobilization; initial site clean-up; site preparation; removal of asbestos-containing materials from walls and ceilings; or from
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.