*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Arrow Highway Pavement Rehabilitation and Utility Improvements From Benson Avenue to San Antonio Avenue

The work to be performed under this Contract generally consists of the removal and disposal of existing asphalt pavement surface, cold milling, grading, compaction, paving, striping, and marking. The work also includes removal and reconstruction of Portland cement concrete (PCC) sidewalk; curb & gutter; ADA curb ramp; construction of PCC cross gutter, spandrel, and “V”-gutter; adjustment of utility covers to new grade; installation of storm drain main pipeline; installation of water main pipeline; installation of sewer main pipeline; relocation of various utilities; traffic/pedestrian control; and all appurtenant work necessary for the proper construction of the contemplated improvements in accordance with the Plans.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 06/07/2023 – 3:00 PM
Pre-Bid Mtg: Yes – Non-Mandatory
Pre-Bid Mtg Date: 05/16/2023 – 10:30 AM
Engineer’s Est: We requested the engineer’s estimate from the agency on 05/19/2023. Follow this project to receive further updates.
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:2023-07

(909) 291-2961,
hgonzalez@uplandca.gov

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 06/07/2023 – 3:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.