VALLEY-WIDE PARKING LOT IMPROVEMENT PROJECT
SCOPE OF WORK
Work will primarily consist of the following:
• Cleaning, clearing and crack sealing
• Resurfacing
• Remove
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Zachary De Vine 408-630-2495
zdevine@valleywater.org
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
SCOPE OF WORK
Work will primarily consist of the following:
• Cleaning, clearing and crack sealing
• Resurfacing
• Remove
Scope of Services The project will demolish the existing playground equipment, dispose of waste materials properly, install new playground equipment
THIS PROJECT INCLUDES BC Science & Engineering Building (Phase II) Flooring project
The Project is located at various locations within City of
Cupertino and is described as follows: The work generally consists
DESCRIPTION OF WORK: Contractor shall provide all parts, labor, materials, equipment, and transportation required to provide ON-CALL SERVICES FOR WATER
SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract, and shall provide all
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.