*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Anaheim West Tower HVAC Rehabilitation Phase III

Scope of Services The work to be undertaken during phase 3A consists of demolishing two existing glycol pumps, relocating portions of the existing water treatment system, constructing a reinforced concrete chiller pad, providing and installing pony chiller, provide and install two chilled water pumps, and all required electrical and controls. Phase 3B includes demolishing and removing 7 Fafco ice tanks and their associated housekeeping pads, leveling and painting the ice bank room floor, and painting of new and affected piping.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 05/09/2024 – 2:00 PM
Pre-Bid Mtg: Yes – Mandatory
Pre-Bid Mtg Date: 04/01/2024 – 10:00 AM
Engineer’s Est. Min: $1800000
Engineer’s Est. Max: $1800000

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #: n/a

David Nguyen 714-412-8844
dnguyen@anaheim.net

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 05/09/2024 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.