*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Upper Atherton Creek Stabilization and Flood Mitigation Project

SCOPE OF SERVICES In 2014, an update to the 2001 Drainage Study was requested. Recent residential development may have impacted previously identified drainage issues. Drainage improvements are now required to comply with the Municipal Regional Stormwater Permit (R2-2009-0074) adopted in 2009. In addition, the Town adopted drainage design criteria in January 2013 aimed to reduce peak stormwater flows and improve water quality. The goals of the desired drainage study update are to: Update the inventory of the existing drainage system. Assess current system weaknesses with input from the community. Develop a prioritized plan for improvements to the drainage system, with itemized cost estimates. Review stormwater management policies for compliance with the 2009 Municipal Stormwater Permit. Describe opportunities for regional stormwater detention.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 05/16/2024 – 2:00 PM
Pre-Bid Mtg: Yes – Non-Mandatory
Pre-Bid Mtg Date: 04/30/2024 – 10:30 AM
Engineer’s Est. Min: $45100000
Engineer’s Est. Max: $45100000

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #: n/a

Todd Mortensen (909) 816-2137
ToddM@CapitalPM.com

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 05/16/2024 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.